University of Wisconsin Parking Ramp 75 Joint Repairs and Membrane Replacement
University of Wisconsin Parking Ramp 75 Joint Repairs and Membrane Replacement
Job Location
610 Highland Ave., Madison, WI
Start Date
11/06/2023
End Date
02/19/2024
Project Value
$ 256,860
Engineer/Architect
Pierce Engineers
Owner
Wisconsin Department of Administration, Division of Facilities Development (DOADFD)
Case Study
Work was located within the parking structure on Levels Ground-2 on the North side of the garage along joint line L. Scope of work included installing galvanized steel beams to reinforce:
Broken tee-to-tee connections
Topping slab removal and replacement
Joint sealant replacement and membrane installation