University of Wisconsin Parking Ramp 75 Joint Repairs and Membrane Replacement

University of Wisconsin Parking Ramp 75 Joint Repairs and Membrane Replacement

Job Location

610 Highland Ave., Madison, WI

Start Date

11/06/2023

End Date

02/19/2024

Project Value

$ 256,860

Engineer/Architect

Pierce Engineers

Owner

Wisconsin Department of Administration, Division of Facilities Development (DOADFD)

Case Study

Work was located within the parking structure on Levels Ground-2 on the North side of the garage along joint line L. Scope of work included installing galvanized steel beams to reinforce:

  • Broken tee-to-tee connections
  • Topping slab removal and replacement
  • Joint sealant replacement and membrane installation