Parking Garage Repair Project – Fifth Third Bank, CBRE
Parking Garage Repair Project – Fifth Third Bank, CBRE
Job Location
6111 N River Road, Rosemont, IL
Start Date
04/01/2021
End Date
10/01/2021
Project Value
$ 1,770,000
Engineer/Architect
Kellermeyer Godfryt Hart
Owner
Fifth Third Bank and CBRE
Case Study
The project consisted of 100% removal and replacement of all 20,000 LF of precast tee to tee joint sealants throughout parking structure along with over 350 broken tee to tee connectors being replaced.
Project continued with a traffic bearing membrane system installed on 100% of the roof level and 2 ft wide membrane strips over the tee-to-tee joints on the remainder of the levels 2-5 totaling 55,000 SF