Parking Garage Repair Project – Fifth Third Bank, CBRE

Parking Garage Repair Project – Fifth Third Bank, CBRE

Job Location

6111 N River Road, Rosemont, IL

Start Date

04/01/2021

End Date

10/01/2021

Project Value

$ 1,770,000

Engineer/Architect

Kellermeyer Godfryt Hart

Owner

Fifth Third Bank and CBRE

Case Study

The project consisted of 100% removal and replacement of all 20,000 LF of precast tee to tee joint sealants throughout parking structure along with over 350 broken tee to tee connectors being replaced.

  • Project continued with a traffic bearing membrane system installed on 100% of the roof level and 2 ft wide membrane strips over the tee-to-tee joints on the remainder of the levels 2-5 totaling 55,000 SF