Monona Terrace Parking Ramp Repair and Renovations – Phase 1

Monona Terrace Parking Ramp Repair and Renovations – Phase 1

Job Location

1 John Nolen Drive, Madison, WI

Start Date

03/20/2023

End Date

06/01/2024

Project Value

$ 1,965,000

Engineer/Architect

Shive Hattery and Walker Consultants

Owner

Wisconsin Department of Administration, Division of Facilities Development (DOADFD)

Case Study

Two level precast double tee parking structure above US Route 151 (John Nolen Drive).

  • Majority of scope included supplementing failed shear connections throughout the upper level of the structure utilizing steel beam sections at the underside of the connections
  • Work also included strengthening of the precast flange sections, vertical and horizontal concrete repairs, electrical systems replacement and miscellaneous waterproofing repairs
  • Golf Construction coordinated closely with the Wisconsin DOT and DOA to coordinate access to the structure above the railroad and highway at the underside of the structure