Milwaukee, WI P&DC Circular Ramp (Phase 1) & VMF Repairs (Phase 2)

Milwaukee, WI P&DC Circular Ramp (Phase 1) & VMF Repairs (Phase 2)

Job Location

345 West St. Paul Avenue, Milwaukee, WI

Start Date

09/01/2018

End Date

05/01/2022

Project Value

$ 4,500,012.98

Engineer/Architect

Applied Technologies

Owner

Unites States Post Office

Case Study

Phase 1 was restoration of a 2-story helix ramp that provided access and egress to USPS employees.

  • Work involved 14,000 Square Feet of debris netting removal
  • 1,680 Cubic Feet of horizontal partial depth slab repair
  • 2,425 Cubic Feet of partial depth overhead repair
  • 6.85 tons of supplemental steel reinforcing installation
  • 60 Cubic Feet of concrete beam repair
  • 330 Cubic Feet of vertical concrete wall repair
  • 63,875 Square Feet of corrosion inhibitor sealer application
  • 273 Lineal Feet of joint sealant replacement, and 5,778 of sacrificial anode installation

Phase 2 was restoration of the concrete ceiling within the vehicle maintenance facility.

  • Work was performed on 1-2 mechanic bays at a time
  • The entire HVAC system ductwork had to be removed, temporarily set up, and reinstalled in coordination with concrete repairs
  • Work included 23,740 of netting removal and reinstallation
  • 455 Cubic Feet of overhead slab partial depth repair
  • 3.85 tons of supplemental steel reinforcing installation
  • 23,470 Square Feet of corrosion inhibitor sealer application
  • 23,470 Square Feet of ceiling painting
  • 596 of sacrificial anode installation