Milwaukee, WI P&DC – 6th Street Bridge Repairs

Milwaukee, WI P&DC – 6th Street Bridge Repairs

Job Location

345 West St. Paul Avenue, Milwaukee, WI

Start Date

10/01/2019

End Date

06/01/2022

Project Value

$ 1,419,000

Engineer/Architect

Applied Technologies

Owner

United States Post Office

Case Study

The 6th Street Bridge is the main access road to the loading dock of the Milwaukee, WI Main Post Office. The project involved:

  • 545 Cubic Feet of concrete topping repairs
  • 3,285 Square Feet of traffic coating repairs
  • 16,950 Square Feet debris netting removal and reinstallation
  • 608 Cubic Feet of horizontal slab repair
  • 420 Cubic Feet of overhead slab repair
  • 985 Lineal Feet of concrete crack injection
  • 52,480 Square Feet of concrete corrosion inhibitor installation
  • 16,950 Square Feet of penetrating water repellent installation
  • 825 Lineal Feet of joint sealant replacement