Skip to content
Services
Concrete Repair
Post Tension Repair
Traffic Coatings
Structural Strengthening
Waterproofing
Shotcrete
Expansion Joints
Cast In Place Concrete
Epoxy & Grout Injection
Current Projects & Case Studies
Our Markets
Employment Opportunities
About Us
Our Locations
Services
Concrete Repair
Post Tension Repair
Traffic Coatings
Structural Strengthening
Waterproofing
Shotcrete
Expansion Joints
Cast In Place Concrete
Epoxy & Grout Injection
Current Projects & Case Studies
Our Markets
Employment Opportunities
About Us
Our Locations
Services
Concrete Repair
Post Tension Repair
Traffic Coatings
Structural Strengthening
Waterproofing
Shotcrete
Expansion Joints
Cast In Place Concrete
Epoxy & Grout Injection
Current Projects & Case Studies
Our Markets
Employment Opportunities
About Us
Our Locations
Services
Concrete Repair
Post Tension Repair
Traffic Coatings
Structural Strengthening
Waterproofing
Shotcrete
Expansion Joints
Cast In Place Concrete
Epoxy & Grout Injection
Current Projects & Case Studies
Our Markets
Employment Opportunities
About Us
Our Locations
Louis A Weiss Memorial Hospital Parking Structure Maintenance Repairs
Louis A Weiss Memorial Hospital Parking Structure Maintenance Repairs
Job Location
4650 N Clarendon Avenue, Chicago, IL
Start Date
06/01/2019
End Date
12/30/2019
Project Value
$ 11,963,000
Engineer/Architect
Walker Consultants
Owner
Weiss Memorial Hospital
Case Study
* Winner of ICRI chicago project of the year
Six-Story Post Tensioned Parking Structure involving:
16,000 Square Feet of partial depth slab repair
22,000 Square Feet of full depth slab repairs
2,300 Square Feet of curb repairs
450 Square Feet of ceiling repairs
175 Square Feet of beam repairs
300 Square Feet of column repairs
2,000 Square Feet of wall repairs
120 Lineal Feet of expansion joint replacement
25,000 Lineal Feet of crack and joint sealant replacement
56,000 Square Feet of epoxy leveling repairs
57,000 Square Feet of penetrating sealer application
205,000 Square Feet of traffic bearing membrane application
2,072 Steel I-Beam installations for structural support to replace the existing post tensioning system
Fireproofing of steel I-beams
4,356 Grout Pocket replacements
11 pedestrian door replacements
5,361 Cathodic Anode installations
30,000 Square Feet of façade elastomeric coating
New LED light fixtures for Levels 1-5
New traffic signage package
Rodding and jetting of existing drainage lines
Drain pipe replacement
Removal of urban garden on roof deck