City of Des Moines – Parking Garage Repair Program

City of Des Moines – Parking Garage Repair Program

Job Location

400 Grand Avenue, Des Moines, IA
830 7th Steet, Des Moines, IA

Start Date

07/01/2019

End Date

05/01/2020

Project Value

$ 1,534,000

Engineer/Architect

Walter P. Moore and Associates, Inc.

Owner

City of Des Moines

Case Study

Grand Avenue Parking Garage is a 7-Story Precast structure. The 7th Street Parking Structure is a 6-Story Post Tensioned Garage. The repairs included in both garages were:

  • 3,850 Square Feet of concrete topping repairs
  • 88 Square Feet of partial depth floor repairs
  • 580 Square Feet of overhead concrete repairs
  • 160 Square Feet of Beam Repairs
  • 60 Square Feet of wall repairs
  • 170 Square Feet of grout pocket repairs
  • 150 Square Feet of column repairs
  • 25 Corbel repairs
  • 2,000 Lineal Feet of expansion joint seal replacement
  • 2,240 Lineal Feet of crack repairs
  • 23,500 Lineal Feet of joint sealant replacement
  • 108,000 Square Feet of traffic coating replacement
  • 950 Square Feet of epoxy overlay installation
  • 295 precast connection reconditionings